Planejamento em canteiro de obras : uma análise por meio da simulação a eventos discretos.

dc.contributor.advisorGuimarães, Irce Fernandes Gomes
dc.contributor.advisorGomes, Helton Cristiano
dc.contributor.authorMarchiori, Thársilla Paulino
dc.contributor.refereeGuimarães, Irce Fernandes Gomes
dc.contributor.refereeGomes, Helton Cristiano
dc.contributor.refereeSouza, Flávio Teixeira de
dc.contributor.refereeRusso, Mário Luís Cabello
dc.date.accessioned2024-09-13T20:50:17Z
dc.date.available2024-09-13T20:50:17Z
dc.date.issued2024
dc.descriptionPrograma de Pós-Graduação em Engenharia das Construções. Departamento de Engenharia Civil, Escola de Minas, Universidade Federal de Ouro Preto.
dc.description.abstractO planejamento eficiente de canteiros de obras é fundamental para aumentar a produtividade, reduzir desperdícios e melhorar a comunicação entre os agentes do processo construtivo. Esta dissertação analisa e compara métodos de planejamento de leiaute de canteiros de obras utilizando a simulação de eventos discretos. As estratégias de pesquisa adotadas incluíram a revisão bibliográfica, a identificação das metodologias manuais e computacionais para planejamento do canteiro de obras, elaboração do modelo de simulação computacional que representou um caso real, assim como a elaboração de diferentes cenários para análise de mudanças no leiaute do canteiro de estudo. O caso real adotado para esta pesquisa foi um canteiro de obras, na cidade de Conselheiro Lafaiete, Minas Gerais, com projeto para construção de três residências, entretanto o estudo avaliou o canteiro de obras para a construção da primeira residência. Foram elaborados quatro cenários, sendo o primeiro o representando o leiaute utilizado na obra, a partir do qual foram simuladas possibilidades de disposição dos estoques no canteiro de obras com uso do software Arena® na versão 2022.Como indicador parcial dos cenários da simulação, foram avaliados tempos de espera (Wait Time), tempos de transferência (Transfer Time), tempos de valor agregado (VA Time) e tempos totais (Total Time), dados estes extraídos do software utilizado para a simulação. Comparando os diferentes cenários simulados, observou-se que o leiaute atual utilizado com base de comparação apresentou tempos razoáveis, mas é necessário atuar na redução do tempo de espera para melhorar sua eficiência. O primeiro leiaute sugerido apresentou melhorias no VA Time, mas aumentou o tempo de espera. O segundo leiaute foi bom em tempos de transferência, mas apresentou resultados ruins em tempos de espera, o que pode indicar ineficiências operacionais. O terceiro leiaute simulado apresentou um resultado equilibrado entre tempos totais e de espera, mostrando-se eficiente. Os resultados demonstram que a simulação a eventos discretos pode ser uma ferramenta valiosa para otimizar o arranjo físico dos canteiros, contribuindo para um melhor desempenho das atividades e uma maior eficiência na execução das obras.
dc.description.abstractenEfficient construction site planning is crucial for increasing productivity, reducing waste, and improving communication among construction process agents. This dissertation analyzes and compares methods for planning construction site layouts using discrete event simulation. The research strategies adopted included a bibliographic review, identification of manual and computational methodologies for construction site planning, development of a computational simulation model that represented a real case, as well as the development of different scenarios for analyzing changes in the layout of the study site. The real case adopted for this research was a construction site, in the city of Conselheiro Lafaiete, Minas Gerais, with a project to build three residences, however the study evaluated the construction site for the construction of the first residence. Four scenarios were developed, the first representing the layout used in the work, from which possibilities for arranging stocks on the construction site were simulated using the Arena® software in version 2022. Key indicators such as Wait Time, Transfer Time, Value Added (VA) Time, and Total Time were evaluated based on data from the software. Comparing the different simulated scenarios, the current layout showed reasonable times but needed to reduce wait times to improve efficiency. The first suggested layout improved VA Time but increased wait time. The second layout performed well in transfer times but poorly in wait times, indicating potential operational inefficiencies. The third layout provided a balanced result between total and wait times, proving to be efficient. The results demonstrate that discrete event simulation can be a valuable tool for optimizing construction site layouts, enhancing activity performance, and increasing execution efficiency.
dc.identifier.citationMARCHIORI, Thársilla Paulino. Planejamento em canteiro de obras : uma análise por meio da simulação a eventos discretos. 2024. 127 f. Dissertação (Mestrado Profissional em Engenharia das Construções) - Escola de Minas, Universidade Federal de Ouro Preto, Ouro Preto, 2024.
dc.identifier.urihttps://www.repositorio.ufop.br/handle/123456789/18652
dc.language.isopt
dc.rightsaberto
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Statesen
dc.rights.licenseAutorização concedida ao Repositório Institucional da UFOP pelo(a) autor(a) em 29/08/2024 com as seguintes condições: disponível sob Licença Creative Commons 4.0 que permite copiar, distribuir e transmitir o trabalho, desde que sejam citados o autor e o licenciante. Não permite o uso para fins comerciais nem a adaptação.
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/
dc.subjectCanteiro de obras - layout
dc.subjectSimulação - computadores
dc.titlePlanejamento em canteiro de obras : uma análise por meio da simulação a eventos discretos.
dc.typeDissertacao
Arquivos
Pacote Original
Agora exibindo 1 - 1 de 1
Nenhuma Miniatura disponível
Nome:
DISSERTAÇÃO_PlanejamentoCanteiroObras.pdf
Tamanho:
7.94 MB
Formato:
Adobe Portable Document Format
Licença do Pacote
Agora exibindo 1 - 1 de 1
Nenhuma Miniatura disponível
Nome:
license.txt
Tamanho:
1.71 KB
Formato:
Item-specific license agreed upon to submission
Descrição: