A hydroelectric dam borrow pit rehabilitation. Two decades after the project, what went wrong?

dc.contributor.authorSouza, Yuri Andrade Figueiredo de
dc.contributor.authorLeite, Mariangela Garcia Praça
dc.contributor.authorFujaco, Maria Augusta Gonçalves
dc.date.accessioned2022-09-14T19:43:39Z
dc.date.available2022-09-14T19:43:39Z
dc.date.issued2021pt_BR
dc.description.abstractAlthough environmental rehabilitation projects that did not succeed are not uncommon, there are few research papers that deal with the subject. Works on the rehabilitation of borrow pits are even more rare. In an attempt to fulfill some gaps, the present study sought to evaluate the effectiveness of a program for the restoration of a clay borrow pit used for the construction of a hydroelectric plant, twenty years after its execution. In order to assess the current degradation stage and to identify the possible errors of this intervention, the area was mapped using an unmanned aerial vehicle, which allowed the identification of the remaining physical structures, dimensioning of the actual degraded area and characterization of vegetation cover and types of exposed soil. Physical and chemical parameters of the degraded area soils were compared to those of a contiguous preserved area, which was used as a control. Soils of the degraded area are significantly more compacted (with significant reduction in macroporosity) and depleted in organic matter and nutrients. The results showed that the methodologies used in the rehabilitation project were not sufficient to recover the resilience of a deeply degraded ecosystem. The long- term success of a rehabilitation project is only possible with the guarantee of the ecological sustainability of the area, which is largely related to the restoration of soil ecological processes. Most of the time, this cannot be achieved with the simple use of classical erosion control and revegetation techniques and without the addition of sediment material to aid the process.pt_BR
dc.identifier.citationSOUZA, Y. A. F. de; LEITE, M. G. P.; FUJACO, M. A. G. A hydroelectric dam borrow pit rehabilitation. Two decades after the project, what went wrong?. Journal of Environmental Management, v. 293, 2021. Disponível em: <https://www.sciencedirect.com/science/article/pii/S0301479721009129>. Acesso em: 29 abr. 2022.pt_BR
dc.identifier.doihttps://doi.org/10.1016/j.jenvman.2021.112850pt_BR
dc.identifier.issn0301-4797
dc.identifier.urihttp://www.repositorio.ufop.br/jspui/handle/123456789/15272
dc.identifier.uri2https://www.sciencedirect.com/science/article/pii/S0301479721009129pt_BR
dc.language.isoen_USpt_BR
dc.rightsrestritopt_BR
dc.subjectSoil resiliencept_BR
dc.subjectDegraded areapt_BR
dc.subjectEnvironmental rehabilitation projectpt_BR
dc.titleA hydroelectric dam borrow pit rehabilitation. Two decades after the project, what went wrong?pt_BR
dc.typeArtigo publicado em periodicopt_BR
Arquivos
Pacote Original
Agora exibindo 1 - 1 de 1
Nenhuma Miniatura disponível
Nome:
ARTIGO_HydroeletricDamBorrow.pdf
Tamanho:
13.39 MB
Formato:
Adobe Portable Document Format
Descrição:
Licença do Pacote
Agora exibindo 1 - 1 de 1
Nenhuma Miniatura disponível
Nome:
license.txt
Tamanho:
1.71 KB
Formato:
Item-specific license agreed upon to submission
Descrição: