Use este identificador para citar ou linkar para este item: http://www.repositorio.ufop.br/jspui/handle/123456789/8822
Registro completo de metadados
Campo Dublin CoreValorIdioma
dc.contributor.authorToffolo, Túlio Ângelo Machado-
dc.contributor.authorSantos, Haroldo Gambini-
dc.contributor.authorCarvalho, Marco Antonio Moreira de-
dc.contributor.authorAraujo, Janniele Aparecida Soares-
dc.date.accessioned2017-10-02T11:47:38Z-
dc.date.available2017-10-02T11:47:38Z-
dc.date.issued2015-
dc.identifier.citationTOFFOLO, T. A. M. et al. An integer programming approach to the multimode resource-constrained multiproject scheduling problem. Journal of Scheduling, v. 19, p. 295–307, 2015. Disponível em: <https://link.springer.com/article/10.1007/s10951-015-0422-4>. Acesso em: 28 jul. 2017.pt_BR
dc.identifier.issn1099-1425-
dc.identifier.urihttp://www.repositorio.ufop.br/handle/123456789/8822-
dc.description.abstractThe project scheduling problem (PSP) is the subject of several studies in computer science, mathematics, and operations research because of the hardness of solving it and its practical importance. This work tackles an extended version of the problem known as the multimode resourceconstrained multiproject scheduling problem. A solution to this problem consists of a schedule of jobs from various projects, so that the job allocations do not exceed the stipulated limits of renewable and nonrenewable resources. To accomplish this, a set of execution modes for the jobs must be chosen, as the jobs’ duration and amount of needed resources vary depending on the mode selected. Finally, the schedule must also consider precedence constraints between jobs. This work proposes heuristic methods based on integer programming to solve the PSP considered in the Multidisciplinary International Scheduling Conference: Theory and Applications (MISTA) 2013 Challenge. The developed solver was ranked third in the competition, being able to find feasible and competitive solutions for all instances and improving best known solutions for some problems.pt_BR
dc.language.isoen_USpt_BR
dc.rightsrestritopt_BR
dc.subjectMultimode resource-constrained multiproject scheduling problempt_BR
dc.subjectInteger programmingpt_BR
dc.subjectMatheuristicspt_BR
dc.titleAn integer programming approach to the multimode resource-constrained multiproject scheduling problem.pt_BR
dc.typeArtigo publicado em periodicopt_BR
dc.identifier.uri2https://link.springer.com/article/10.1007/s10951-015-0422-4pt_BR
dc.identifier.doihttps://doi.org/10.1007/s10951-015-0422-4-
Aparece nas coleções:DECSI - Artigos publicados em periódicos

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
ARTIGO_IntergerProgrammingAproach.pdf
  Restricted Access
590,07 kBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.