Página de Busca


Filtros correntes:
Retornar valores
Adicionar filtros:

Utilizar filtros para refinar o resultado de busca.


Resultado 1-5 de 5.
  • Anterior
  • 1
  • Próximo
Conjunto de itens:
Data do documentoTítuloAutor(es)
2014Estimate of hourly productivity applied to elaboration and implementation of mining plans.Rodovalho, Edmo da Cunha; Cabral, Ivo Eyer
2015Analysis of the economic feasibility of a mining project due to the presence of natural underground cavities.Aquino, Iure Borges de Moura; Lima, Hernani Mota de
2018Direct block scheduling under marketing uncertainties.Burgarelli, Hudson Rodrigues; Souza, Felipe Ribeiro; Nader, Alizeibek Saleimen; Torres, Vidal Félix Navarro; Câmara, Taís Renata; Arroyo Ortiz, Carlos Enrique; Galery, Roberto
2018Application of optimized models through direct block scheduling in traditional mine planning.Campos, Pedro Henrique Alves; Hori, Carla Eponina; Morales, N. M.
2017Incorporation of geological uncertainty in pit optimization with geostatistics simulation.Souza, Rafael Alvarenga de; Cabral, Ivo Eyer