Please use this identifier to cite or link to this item: http://www.repositorio.ufop.br/handle/123456789/11265
Title: Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project.
Authors: Campos, Pedro Henrique Alves
Cabral, Ivo Eyer
Arroyo Ortiz, Carlos Enrique
Morales, Nelson
Keywords: Production scheduling
Issue Date: 2018
Citation: CAMPOS, P. H. A. et al. Comparison between the application of the conventional mine planning and of the direct block scheduling on an open pit mine project. REM - International Engineering Journal, v. 71, p. 269-274, 2018. Disponível em: <http://www.scielo.br/scielo.php?script=sci_arttext&pid=S2448-167X2018000200269>. Acesso em: 12 fev. 2019.
Abstract: Historically, since the 60's, traditional mine planning consists of several distinct stages: 1) Definition of the ultimate pit - the portion of the blocks that results in the greatest total value; 2) Pushback selection - based on the generation of nested pits, obtained with the change in the value of the ore price; 3) Long-term production scheduling. Although considered quite satisfactory, this methodology presents some flaws: The stages, even if considered individually optimal, may not be when put together. The opportunity cost is not considered and the cut-off is fixed. Due to the recent computational advances, a new technique has been growing and is more reliable: the direct block sequencing. In this methodology, the steps are consolidated into only one process, improving the economic results, reducing the total execution time and obtaining, in fact, an optimal planning. The aim of this work is to compare the results of the two planning methods applied in a database of a Brazilian iron ore mine and to show the real advantages and disadvantages of each one. To solve the direct block sequencing technique, Doppler was used, a tool developed by Delphos Mine Planning Laboratory, located at the University of Chile. The traditional methodology was executed through Whittle software. Lastly, a medium-term scheduling was performed using Deswik software.
URI: http://www.repositorio.ufop.br/handle/123456789/11265
metadata.dc.identifier.doi: http://dx.doi.org/10.1590/0370-44672017710037
ISSN: 1807-0353
metadata.dc.rights.license: A REM - International Engineering Journal - autoriza o depósito de cópia de artigos dos professores e alunos da UFOP no Repositório Institucional da UFOP. Licença concedida mediante preenchimento de formulário online em 12 set. 2013.
Appears in Collections:DEMIN - Artigos publicados em periódicos

Files in This Item:
File Description SizeFormat 
ARTIGO_ComparisonApplicationConventional.pdf1,33 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.