Use este identificador para citar ou linkar para este item: http://www.repositorio.ufop.br/jspui/handle/123456789/6752
Registro completo de metadados
Campo Dublin CoreValorIdioma
dc.contributor.authorRibeiro, Breno Gonçalves Cardozo-
dc.contributor.authorSousa, Wilson Trigueiro de-
dc.contributor.authorLuz, José Aurélio Medeiros da-
dc.date.accessioned2016-08-08T14:41:31Z-
dc.date.available2016-08-08T14:41:31Z-
dc.date.issued2016-
dc.identifier.citationRIBEIRO, B. G. C.; SOUSA. W. T. de; LUZ, J. A. M. da. Feasibility project for implementation of conveyor belts in an iron ore mine. Study case: Fabrica Mine in Minas Gerais State, Brazil. REM. Revista Escola de Minas,v. 69, p. 79-83, 2016. Disponível em: <http://www.scielo.br/scielo.php?pid=S0370-44672016000100079&script=sci_abstract>. Acesso em: 11 jul. 2016.pt_BR
dc.identifier.issn1807-0353-
dc.identifier.urihttp://www.repositorio.ufop.br/handle/123456789/6752-
dc.description.abstractThis article objectifies the implementation of a conveyor belt in an iron ore mine. The mine operational costs of the company Vale S.A. have a tendency to increase in coming years. This increase is related to the rising price of labor, fuel, tires, mainte¬nance costs and large transport distances. Meanwhile, environmental impacts also need to be reduced. The case study of the Fabrica mine operated by VALE in the city of Congonhas, in Minas Gerais State of Brazil, was chosen aiming for a comparative study between the employment of big trucks and the deployment of conveyor belts. The decision for the best alternative would be made by an economic analysis of the incremental cash flow. After the economic evaluation of the project, economic and environmental gains were expected for the alternative of conveyor belt deployment.pt_BR
dc.language.isoen_USpt_BR
dc.rightsabertopt_BR
dc.subjectConveyor beltspt_BR
dc.subjectIncremental cash flowpt_BR
dc.subjectMining projectpt_BR
dc.subjectEconomic evaluationpt_BR
dc.titleFeasibility project for implementation of conveyor belts in an iron ore mine. Study case : Fabrica Mine in Minas Gerais State, Brazil.pt_BR
dc.typeArtigo publicado em periodicopt_BR
dc.rights.licenseA Revista Escola de Minas - REM - autoriza o depósito de cópia de artigos dos professores e alunos da UFOP no Repositório Institucional da UFOP. Licença concedida mediante preenchimento de formulário online em: 12 set. 2013.pt_BR
dc.identifier.doihttp://dx.doi.org/10.1590/0370-44672013690021-
Aparece nas coleções:DEMIN - Artigos publicados em periódicos

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
ARTIGO_FeasibilityProjectImplemetation.pdf128,62 kBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.