Página de Busca
Adicionar filtros:
Utilizar filtros para refinar o resultado de busca.
Resultado 1-5 de 5.
- Anterior
- 1
- Próximo
Conjunto de itens:
Data do documento | Título | Autor(es) |
---|---|---|
2014 | Estimate of hourly productivity applied to elaboration and implementation of mining plans. | Rodovalho, Edmo da Cunha; Cabral, Ivo Eyer |
2015 | Analysis of the economic feasibility of a mining project due to the presence of natural underground cavities. | Aquino, Iure Borges de Moura; Lima, Hernani Mota de |
2018 | Direct block scheduling under marketing uncertainties. | Burgarelli, Hudson Rodrigues; Souza, Felipe Ribeiro; Nader, Alizeibek Saleimen; Torres, Vidal Félix Navarro; Câmara, Taís Renata; Arroyo Ortiz, Carlos Enrique; Galery, Roberto |
2018 | Application of optimized models through direct block scheduling in traditional mine planning. | Campos, Pedro Henrique Alves; Hori, Carla Eponina; Morales, N. M. |
2017 | Incorporation of geological uncertainty in pit optimization with geostatistics simulation. | Souza, Rafael Alvarenga de; Cabral, Ivo Eyer |
Busca facetada
Assunto
Has File(s)
- 5 true